2011年9月20日星期二

14 years long. The road

In 1997, the city government ChangWuHui sure electricity building should be removed; In 2000, the city government first put forward the power of blasting demolition of buildings; In 2004, the municipal planning bureau second put forward the electricity building; By 2009 for subway, the city government put forward again the electricity building; Until the end of June this year, electricity building began to dismantle the process, for 14 years. In the whole process, and even cause the struggle of the Chinese people's political consultative conference proposal.

Is to leave

DuoCi into the political consultative conference proposal

The our city second clearly put demolished electricity building, is in 2004.

Municipal planning bureau relevant controller introduces, in accordance with relevant regulations to protect building to determine the scope of protection, protect the surrounding buildings to determine buffer and development zones. Buffer size or the buildings inside whether height, must never exceed the protection architecture. Earlier, planning department in the determination of the historical and cultural blocks, Renaissance garden street when plan, have pointed out that, in the four pieces block new buildings to less than 68 building height protects a building FangYan of 15 cm. "The museum around the province museum, square European construction such as international hotel, forming a harmonious and balanced triangle layout, and electricity building damage of the harmonious beauty here."

According to the our city is responsible for the relevant leaders in memories, it had been proposed move without electricity building, but in the end also conclude without concrete result. Because of the electric power industry development after, the original heilongjiang electric power dispatching center needs to expand capacity has power department, in the development zone of songshan road the hanjiang river road with the construction of the new center, but in 2004 the provincial power dispatching center main body to move, but after the power of the emergency department will dispatch center, "failing" and part of the service department in electricity building continue to office. The second the behavior has failed.
(wow gold) http://www.wow77.com (buy wow gold)
(diablo 3 powerleveling) http://www.myd3gold.com (diablo 3 gold)
(wow gold) http://www.wow-gold-team.com (buy wow gold)

World of Warcraft FAQs, World of Warcraft Tips ,  World of Warcraft equipment ,   World of Warcraft Guide ,  Warcraft skills ,  Pictures of warcraft ,  Lovely Girl Warcraft,

没有评论:

发表评论